Games like Project Planets
Looking for games like Project Planets? Here are top action recommendations, selected from player-similarity data — start with Dino Ducket Dash, Aether Fuel or The Salvager's Dream.
- 50%Game Brain Score50% User Score 1 reviews
Dino Ducket Dash is an 80s-like arcade game. You play as a Dinosaur who needs to collect duckets, dodge enemy dinosaurs and use power ups in order to pay your way onto a space ship that'll help you escape the planet before the meteor showers begin. Fast paced arcade action!Play with up to 4-players in local coopSet and beat High Scores CREDITS! Gabriel Cornish: Project lead, core gameplay, musi… If you enjoyed this game, see our list of games similar to Dino Ducket Dash.
View Game
- 50%Game Brain Score50% User Score 1 reviews
Fill the tankers of your favorite spaceship with powerful Aether Fuel, and challenge the fiercest competitors of the galaxy! It's time to race! Commands: WASD or Arrows: movementSpace: shoot Your weapons get reloaded after a lap is completed. A game developed with HomeTeam Gamedev! Join us at: https://hometeamgamedev.com/ Developed October 31st, 2021 - January 23rd, 2022 Ian Cherabier: Project lea… If you enjoyed this game, see our list of games similar to Aether Fuel.
View Game
- View Game
Credits Will McKay: Project lead, core gameplay, main input handling, room rotation system, shooting enemy functionality, healing cooldown, map system, dialog system, assorted bugfixes, door functionality, block pushing, laser sword, story integration, dash indicator, boss mechanics, menu, co-level designer, enemy spawning, powercell icon, map fog of war Johan Östling: Forklift enemy (model, textu… If you enjoyed this game, see our list of games similar to The Salvager's Dream.
- 50%Game Brain Score50% User Score 1 reviews
Developed Jan 5 - Apr 5, 2020 Project lead, main concept, core gameplay, flipspace growth, main level design (incl. hub), minimap, title screen, pixel fonts, additional player animations (EV suit, death, no gun crouch/idle), powerup effects, tiles (dirt), many player sounds, hover tooltips, portrait work, assorted bug fixes, map editor integration, UI design, bullet motion/collision, pooling, achi… If you enjoyed this game, see our list of games similar to Flipside.
View Game
- 51%Game Brain Score51% User Score 2 reviews
Developed May 16 - Oct 10, 2021 Project lead, core gameplay, spawn system and related custom editor, crude underlying game engine (AABB collision, animation, graphics layers, entity management), lava dragon boss functionality, initial version of powerups, enemy AI, two player support, second player AI, ground waypoint patrols, stars/lava backgrounds (not including rocky crust), moon depth map (fin… If you enjoyed this game, see our list of games similar to Wings Tale.
View Game
- 51%Game Brain Score51% User Score 2 reviews
CONTROLS: ENTER = Start from menu, skip cutsceneA / LEFT ARROW = Walk leftD / RIGHT ARROW = Walk rightW / UP ARROW = JumpD / DOWN ARROW = CrouchSPACE = Main attack (chain whip)Z = Handlebar attack (once picked up)X = Wheel attack (once picked up)M = MuteP = Pause+/- = Adjust volume GAMEPAD is supported CHEATS: 1 = level 12 = level 23 = level 3type: w-h-e-e-l = give wheel weapontype: h-a-n-d-l-e = … If you enjoyed this game, see our list of games similar to Xeno Jackers.
View Game
- View Game50%Game Brain Score50% User Score 1 reviews
Developed Jan 5 - Apr 5, 2020 Project lead, main concept, core gameplay, flipspace growth, main level design (incl. hub), minimap, title screen, pixel fonts, additional player animations (EV suit, death, no gun crouch/idle), powerup effects, tiles (dirt), many player sounds, hover tooltips, portrait work, assorted bug fixes, map editor integration, UI design, bullet motion/collision, pooling, ach… If you enjoyed this game, see our list of games similar to Flipside.
- View Game10%Game Brain Score10% User Score 1 reviews
You can make games with us! Join at http://HomeTeamGameDev.com Scores save automatically. NOW AVAILABLE for Quest VR (though currently in alpha) - free, side-loaded apk, install it using SideQuest or similar methods. Try the download on this page for time-cannon-quest-vr_to_sideload.zip! Developed July 19 - Dec 20, 2020 Project lead, core gameplay, railgun and chain reaction functionality, Quest… If you enjoyed this game, see our list of games similar to Time Cannon for web (new: Quest VR support in alpha).
You have entered The Dragon's Tavern where the name of the game is card playing. Build your deck and acquire new cards with custom made cards, then take down the opponent AI with a scaling level of difficulty. This project was able to come to life by HomeTeam Game Dev. Developed May 8 to May 20, June 16 to September 4, 2022 - Cassidy Noble: Project lead, core gameplay, character models/rigs/… If you enjoyed this game, see our list of games similar to The Dragon's Tavern.
View Game


- View Game38%Game Brain Score38% User Score 3 reviews
Developed Aug 26 to Dec 9, 2018 Project lead, core functionality, scoring and score pop ups, powerup objects, enemy, projectile, and collision code, level 2 and 3 design, screenshake, menu base code, checkpoint and continues, enemy pathing, cut scene animations, ground enemy integration, main UI integration, missile, ghost, and clear powerups, boss behavior improvements, boss explosions, all flyi… If you enjoyed this game, see our list of games similar to G-Type.
- View Game38%Game Brain Score38% User Score 3 reviews
Developed Aug 26 to Dec 9, 2018 Project lead, core functionality, scoring and score pop ups, powerup objects, enemy, projectile, and collision code, level 2 and 3 design, screenshake, menu base code, checkpoint and continues, enemy pathing, cut scene animations, ground enemy integration, main UI integration, missile, ghost, and clear powerups, boss behavior improvements, boss explosions, all flyin… If you enjoyed this game, see our list of games similar to G-Type.
- View Game51%Game Brain Score51% User Score 2 reviews
Developed May 16 - Oct 10, 2021 Project lead, core gameplay, spawn system and related custom editor, crude underlying game engine (AABB collision, animation, graphics layers, entity management), lava dragon boss functionality, initial version of powerups, enemy AI, two player support, second player AI, ground waypoint patrols, stars/lava backgrounds (not including rocky crust), moon depth map (fi… If you enjoyed this game, see our list of games similar to Wings Tale.
- View Game
Project lead, core gameplay, character art, quest system, level design, pressure plate, enemies (art, code, behavior for standard types and boss), main pathfinding, quest authoring, transitions, shops, projectiles, time of day, trees, item drops, screen shake, most outside tiles, NPCs (old man, chuck, farmer, red), moveable crate, additional weather features: Vince McKeown Chef Gormondo NPC, game… If you enjoyed this game, see our list of games similar to Forgotten Road.
- View Game
Developed Nov 11, 2018 to Feb 24, 2019 Project lead, core gameplay, slime enemy, level editor, map switching, terrain tilesheet integration stats implementation, bug fixes, xp rewards and leveling up, collision handling, snow art (bush, tree, pit rebel tent), forest art (portal), inventory, depth sorting, spawn code, main enemy code, level design, save/load: Jaime Rivas Tileset workflow, forest … If you enjoyed this game, see our list of games similar to Flail of the Nordic Tentacles.
15 View GameView Game***PLEASE READ!***RECOMMENDATIONS FROM DEV!*** Hey everybody! The game is in a pretty rough state as I rushed to meet the deadline. I highly recommend using debug functions I left in this build to make your playthrough smoother. At the start I recommend pressing '3' a bunch of times to keep adding to your 'Kronos' count. Then wait for the shop to open once the countdown reaches halfway (Yes! ther… If you enjoyed this game, see our list of games similar to The Blade of Time's Eternal Penguin Warrior: A Quest to Unleash the Full Potential of Time Wielding the Sword of Destiny.
- View Game
Developed Nov 11, 2018 to Feb 24, 2019 Project lead, core gameplay, slime enemy, level editor, map switching, terrain tilesheet integration stats implementation, bug fixes, xp rewards and leveling up, collision handling, snow art (bush, tree, pit rebel tent), forest art (portal), inventory, depth sorting, spawn code, main enemy code, level design, save/load: Jaime Rivas Tileset workflow, forest ti… If you enjoyed this game, see our list of games similar to Flail of the Nordic Tentacles.
- View Game30%Game Brain Score30% User Score 1 reviews
Developed Jan 16 - May 15, 2022 Project lead, core gameplay, warrior animations, ghost and skeleton sprite facings, level design (shared), assorted environment art (yellow), statue, spider webs, collision handling, projectiles art/code, lock and key, pathfinding, art integration, tuning: Vince McKeown Tile atlas, level design (shared), dungeon music, whisp particle fix, room optimization (enemie… If you enjoyed this game, see our list of games similar to Escape from Cellblock 60.
- 30%Game Brain Score30% User Score 1 reviews
Developed Jan 16 - May 15, 2022 Project lead, core gameplay, warrior animations, ghost and skeleton sprite facings, level design (shared), assorted environment art (yellow), statue, spider webs, collision handling, projectiles art/code, lock and key, pathfinding, art integration, tuning: Vince McKeown Tile atlas, level design (shared), dungeon music, whisp particle fix, room optimization (enemies/… If you enjoyed this game, see our list of games similar to Escape from Cellblock 60.
View Game
- View Game50%Game Brain Score50% User Score 1 reviews
Windows 7 or Edge browser note: if the webGL build above does not run in-browser please scroll to the bottom of this page where you can find our Windows Download. You'll still be able to play it that way. Developed Jan 7 - Apr 8, 2018 by members of Gamkedo Club Project lead, Robo Warrior model, pilot sprite, win state, goal UI, mech collision code, weapon slot icons, health code, mech stealing f… If you enjoyed this game, see our list of games similar to Steel Cavalry.
- 50%Game Brain Score50% User Score 1 reviews
Windows 7 or Edge browser note: if the webGL build above does not run in-browser please scroll to the bottom of this page where you can find our Windows Download. You'll still be able to play it that way. Developed Jan 7 - Apr 8, 2018 by members of Gamkedo Club Project lead, Robo Warrior model, pilot sprite, win state, goal UI, mech collision code, weapon slot icons, health code, mech stealing fea… If you enjoyed this game, see our list of games similar to Steel Cavalry.
View Game
- View Game50%Game Brain Score50% User Score 1 reviews
Project lead, core gameplay code, debug cheats, body shop functionality and related art, assorted asset integration, camera scrolling, AI waypoint following, internal editor before Tiled integration, race results screne, cash pickup, city sprite sheet, AI collision avoidance, trees and map buildings art, character selection screen, race time and related tracking, name entry, assorted bug fixes, ro… If you enjoyed this game, see our list of games similar to Little Racers.
- View Game
Developed Jan 17 - May 9, 2021 Project lead, core gameplay and main engine code, base table functionality, Tiled map editor integration, ball/flipper physics, additional asset integration and assorted bugfixes, layout tweaks, multi-collider object support, planet bumpers with animation, table selection screen: H Trayford Rocket/space table art (background, star animations, planet sprite, sputni… If you enjoyed this game, see our list of games similar to Flipperball.
- View Game30%Game Brain Score30% User Score 1 reviews
Developed Nov 5, 2017 - Feb 25, 2018 Lead/pitch, core gameplay code, parallax support, split fire modes, upgrades between stages: Chris DeLeon Wave beam, laser attack, missiles, level code, two player mode, organized refactoring, ice sliding, progress bar, carnage mode, laser ship code and art, logo and title menu animation, sound code, end sequence code and ending story writing, crystalline coa… If you enjoyed this game, see our list of games similar to Excalibur SDS.
- 51%Game Brain Score51% User Score 2 reviews
Developed Nov 15 - Jan 24, 2021 Project lead, core gameplay, example maps, enemy wave functionality, custom level and map editor, slowdown tower / gun tower and flame tower code, enemy health bars, map fixes, turtle / car / blob enemy art, mirror image support, gum stealing, tower selection UI, tower upgrade menu, sound implementation, cheat code function, main menu and level selection code, credi… If you enjoyed this game, see our list of games similar to Dimension Defense.
View Game
Tyler Funk: Project lead, core gameplay, main Rovey animations (idle, walk, jump, fall), camera control, conveyor belt, lava launcher, waypoint system, moving platform support, spring pad, bounds detection, player health UI, alien egg, caledera scene and related model, title to options transitions, persistent menu options, jetpack bar, ship animation scene, story skip, checkpoint placement, pause … If you enjoyed this game, see our list of games similar to Rovey.
View Game


- View Game30%Game Brain Score30% User Score 1 reviews
Developed Nov 5, 2017 - Feb 25, 2018 Lead/pitch, core gameplay code, parallax support, split fire modes, upgrades between stages: Chris DeLeon Wave beam, laser attack, missiles, level code, two player mode, organized refactoring, ice sliding, progress bar, carnage mode, laser ship code and art, logo and title menu animation, sound code, end sequence code and ending story writing, crystalline coast… If you enjoyed this game, see our list of games similar to Excalibur SDS.
- View Game50%Game Brain Score50% User Score 1 reviews
Project lead, core gameplay code, debug cheats, body shop functionality and related art, assorted asset integration, camera scrolling, AI waypoint following, internal editor before Tiled integration, race results screne, cash pickup, city sprite sheet, AI collision avoidance, trees and map buildings art, character selection screen, race time and related tracking, name entry, assorted bug fixes, ro… If you enjoyed this game, see our list of games similar to Little Racers.
- 50%Game Brain Score50% User Score 1 reviews
Recommended Downloadable Desktop Versions Available Below! Warning: this game is better played with a game controller (XBoxs, PSs, or similar)Made in Gamkedo Club (https://gamkedo.com)Credits: Klaim (A. Joël Lamotte): Project lead, core concept and main gameplay code, level waves system, player movement and firing, player ship, in-game animations, overload feature, bullets, enemy AI, bosses, sc… If you enjoyed this game, see our list of games similar to Radiant Laser Cross.
View Game
Developed Jan 17 - May 9, 2021 Project lead, core gameplay and main engine code, base table functionality, Tiled map editor integration, ball/flipper physics, additional asset integration and assorted bugfixes, layout tweaks, multi-collider object support, planet bumpers with animation, table selection screen: H Trayford Rocket/space table art (background, star animations, planet sprite, sputnik,… If you enjoyed this game, see our list of games similar to Flipperball.
View Game
- View Game
Developed July 5 - Sept 27, 2020 Project lead, core gameplay, property system, main manager AI, time of year, isometric rendering, camera control, additional buildings, art integration, opening story, citizen complaints, seasons, clouds code, landlord events: Vince McKeown Cloud variations, 3 story building, storm clouds, status bubble, hunger icon, human art variations, sleep status, readability … If you enjoyed this game, see our list of games similar to Springfield Property Manager.
Evil gatekeepers. Transgendered protagonist. Overdue reckoning.This is a casual sci-fi action-adventure bullet-hell dodger about transgender people re-visiting a post-apocalyptic earth and searching for a lost artefact. A wholesome trauma-healing adventure. If you enjoyed this game, see our list of games similar to Trans Agent X.
View Game


There are 5 pilots in training, each with unique characteristics. It is the day of the final level and everyone wil l face a test to see who will be able to accept the next challenge, a true galactic mission. Be you one of the selecteds! If you enjoyed this game, see our list of games similar to True Galactic Mission.
View Game


- View Game
Developed June 12-Oct 16, 2022 Project lead, core gameplay, custom level editor and related UI/format, level design, hitbox collision system, enemy behaviors, assorted bug fixes, general asset integration, title screen, level timer, level names setup: Gonzalo Delgado Sprite art (donut variants with animations, printer enemy, graves, bushes, rocks, lantern, expresso gangster, toaster bat), visual… If you enjoyed this game, see our list of games similar to Witches and Guns 2.
- View Game51%Game Brain Score51% User Score 2 reviews
Developed Feb 3 to Apr 28, 2019 Project lead, core functionality, majority of foundational art (including village / cave / forest environments, player sprites, most enemy sprites), combat room locks, initial menu code, main enemy art and behaviors (flowers, zombies, imp), potions support, Big Boss and Lich code (collaboratively with others on the team), co-op (non-AI), cutscene improvements, cave… If you enjoyed this game, see our list of games similar to Delv.
Welcome to the domain of the Raven - the cryptic creator of the local Magic school. He has summoned you here to complete his Trials to see if you are worthy of his more... ambitious projects. Use your spells to fight creature of North American lore along with you and 5 other students as you grow as witches and wizards. ------------------------- Made in HomeTeam Game Dev - June 18th-October 1st, 2… If you enjoyed this game, see our list of games similar to Raven's Training Ground.
View Game


- 31%Game Brain Score31% User Score 2 reviews
Tyler Funk: Project lead, core gameplay, main controls, weapon bob, step sounds, low health heartbeat feedback, teleport sound, main weapon features (scattershot, ricochet, rapid fire), store UI, outline shader effect, hub scene, occlusion culling, player death, settings persistence, menu font selection, gamepad support, custom sliders, assorted integration, html5/webGL related support fixes, mino… If you enjoyed this game, see our list of games similar to No Quarter.
View Game
Developed from September 20, 2020 to November 22, 2020 If game has poor performance is browser the downloaded version may work better. Credits: Will McKay: Project lead, core gameplay implementation, concept, level format, music, barrel rolling, event system, enemy types, assorted bug fixing, models (ships, asteroids), difficulty tuning, additional sounds (engine), mouse control, boss fight, lev… If you enjoyed this game, see our list of games similar to Solar Cinders.
View Game
- 40%Game Brain Score40% User Score 1 reviews
Credits Gabriel Cornish: Project lead, core gameplay, enemy AI pathfinding, base HUD, original tileset, level design (including tutorial), turn system, sounds (coin, chest), transition effects, chest destruction, dialog system, palette, assorted bug fixes, timer, game over screenDaniel Song: Sprite animations (player, enemy, princess, old man), tilesets (lava, ice), additional integration supportC… If you enjoyed this game, see our list of games similar to Dungeon Ducket Delve.
View Game
- View Game51%Game Brain Score51% User Score 2 reviews
Developed Feb 3 to Apr 28, 2019 Project lead, core functionality, majority of foundational art (including village / cave / forest environments, player sprites, most enemy sprites), combat room locks, initial menu code, main enemy art and behaviors (flowers, zombies, imp), potions support, Big Boss and Lich code (collaboratively with others on the team), co-op (non-AI), cutscene improvements, cave … If you enjoyed this game, see our list of games similar to Delv.
- 41%Game Brain Score41% User Score 2 reviews
Developed Jan 31 - May 23, 2021 Project lead, initial gameplay, quest authoring, collisions, unvisited areas hidden, door puzzle functionality, instructions, main character code, reference gathering, object interaction, sounds (mana, health, doors, pot breaking, coin pickup, arrow collection), potions (mana, healing), art (ax dwarf with animations, coins, pot), pathfinding, drops (health, arrows, … If you enjoyed this game, see our list of games similar to Dagger's Gate.
View Game
Developed June 12-Oct 16, 2022 Project lead, core gameplay, custom level editor and related UI/format, level design, hitbox collision system, enemy behaviors, assorted bug fixes, general asset integration, title screen, level timer, level names setup: Gonzalo Delgado Sprite art (donut variants with animations, printer enemy, graves, bushes, rocks, lantern, expresso gangster, toaster bat), visual e… If you enjoyed this game, see our list of games similar to Witches and Guns 2.
View Game
- 89%Game Brain ScoreMost mentioned positive aspects:gameplay, musicMost mentioned negative aspects:story, replayability92% User Score 144 reviewsCritic Score 70%1 reviews
Graze the enemy’s bullets, Charge them head-on, and Wreak Havoc!! An exhilarating and dangerous shoot-em-up! This is a game for those with courage and survival instinct! If you enjoyed this game, see our list of games similar to Graze Counter.
View Game


- 51%Game Brain ScoreMost mentioned positive aspects:graphics, humorMost mentioned negative aspects:gameplay, music51% User Score 191 reviews
Step into the space suit of valiant gravity badger Captain T Bayback as he ventures into the deadly depths of deep space to save his friends, family and the universe itself from the threat of the deadly Evil Honey Badgers, aka the Hellsett. For the first time EVER a game unites the thrilling elements of Badgers and Gravity to create a stunningly presented physics-based puzzle game that will take y… If you enjoyed this game, see our list of games similar to Gravity Badgers.
View Game


- 54%Game Brain ScoreMost mentioned positive aspects:story, gameplayMost mentioned negative aspects:stability, atmosphere54% User Score 61 reviews
Close Order is an arcade shooter with one simple goal: become a badass armada! In this mashup of genres, defeat enemies for parts to build up an armada of ships around you. Fight from a distance, charge headfirst into battle, or create a mix of anything and everything. You decide how to play! If you enjoyed this game, see our list of games similar to Close Order.
View Game


- View Game50%Game Brain Score50% User Score 1 reviews
Developed Nov 18, 2018 to Feb 17, 2019 Main concept and project co-lead, base functionality for prototype, John character, dialog system code and original format, inventory code, pixel doubling, panning camera, room loading, dialog mouth animations, animation code, level editor, store front art, multiple choice dialog feature, cutscene code, John and Rose dialog portraits, fade effect, Julie's st… If you enjoyed this game, see our list of games similar to Warped Radar.
- View Game50%Game Brain Score50% User Score 1 reviews
Developed Nov 18, 2018 to Feb 17, 2019 Main concept and project co-lead, base functionality for prototype, John character, dialog system code and original format, inventory code, pixel doubling, panning camera, room loading, dialog mouth animations, animation code, level editor, store front art, multiple choice dialog feature, cutscene code, John and Rose dialog portraits, fade effect, Julie's sto… If you enjoyed this game, see our list of games similar to Warped Radar.
You are finishing your second year student at Clarks Magic Academy when students start disappearing. No one knows what is going on, but a similar event happened 50 years ago. You will need to explore dungeons to rescue students, but also - keep up your grades, go to class, hang out at school clubs, and learn more about your friends. This project was inspired by the Persona series and Harry Potte… If you enjoyed this game, see our list of games similar to Mysteries of Clarks Magic Academy.
View Game


Journey back to the days of Camelot. King Uther Pendragon has just died and we are needing a replacement for the throne. You, Arthur, must venture through the lands with your party members, talking to townspeople, buying items, conquering creatures of lore, and defeating bosses of legend in turn based combat. A DevPods game made in Unreal 5.5.4 May 18, 2025 - Oct 5, 2025 Contributors Dani … If you enjoyed this game, see our list of games similar to King Arthur Tales of the Sword.
View Game


- View Game50%Game Brain Score50% User Score 1 reviews
Developed Feb 16 to May 3, 2020 Project lead (also for the original Falldale), core gameplay, cliff tiles, player animation updates, bush tiles, blacksmith shop, new goblin animations, assorted map updates, tree update, town redesign, Orc and Arya updates, optimizations, character creation screen graphics, music integration, garden tiles, mausoleum art, GUI buttons, skeleton animations, Rowan ani… If you enjoyed this game, see our list of games similar to Falldale.
- 50%Game Brain Score50% User Score 1 reviews
Developed Feb 16 to May 3, 2020 Project lead (also for the original Falldale), core gameplay, cliff tiles, player animation updates, bush tiles, blacksmith shop, new goblin animations, assorted map updates, tree update, town redesign, Orc and Arya updates, optimizations, character creation screen graphics, music integration, garden tiles, mausoleum art, GUI buttons, skeleton animations, Rowan anim… If you enjoyed this game, see our list of games similar to Falldale.
View Game






































