Skip to main content
Games like Zukara

Games like Zukara

Games like Zukara

Looking for games like Zukara? Here are top shooter recommendations with a science fiction focus, selected from player-similarity data — start with Cyborg3003, GORE RAPTURE or The Voyager.

Change display type

Skip Platform filter

Skip Play Mode filter

Skip Price filter
  1. View Game
    41%Game Brain Score
    Most mentioned positive aspects:atmosphere, story
    Most mentioned negative aspects:gameplay, optimization
    70% User Score Based on 10 reviews

    6-player co-op survival horror at its finest with cyborgs, monsters, and aliens. If you enjoyed this game, see our list of games similar to Cyborg3003.

    View Game
  2. The adventure begins when Capt. Gore Rapture and crew are called to the Planet Goatainn. The reason is that the evil on this planet is affecting the entire solar system. Their mission is to neutralize all foes on the once Glorious planet. The landing was rough, and the result was that Cpt. Rapture was knocked unconscious. The ship's C.O., Col. Randulph, puts the Captain on a hypnotic schedule and … If you enjoyed this game, see our list of games similar to GORE RAPTURE.

    View Game
  3. After working all your life you have finally managed to build a device that allows you to travel between parallel worlds. will you be able to return home? If you enjoyed this game, see our list of games similar to The Voyager.

    View Game
  4. View Game
    61%Game Brain Score
    Most mentioned negative aspects:gameplay, atmosphere
    72% User Score Based on 36 reviews

    Red Dust: Hardcore FPS in a randomly generated world. Move carefully, shoot accurately, and avoid being shot. Mistakes have consequences. Intense, fast-paced action inspired by Receiver. Play Red Dust for a thrilling FPS experience. If you enjoyed this game, see our list of games similar to Red Dust.

    View Game
  5. View Game
  6. 45%Game Brain Score
    45% User Score Based on 14 reviews

    This is a first-person survival horror game set inside a high-security containment facility during an ongoing system failure. You play as a D-Class test subject who wakes up mid-experiment after containment protocols begin to collapse. With no clear authority to trust, you must explore restricted sectors, read and listen to in-world reports, and complete procedural objectives while surviving hosti… If you enjoyed this game, see our list of games similar to SCP The Beginning.

    View Game
  7. In Void Vanguards, you’ll journey to exotic, perilous planets overrun with hostile alien forces. Your mission: eliminate the threat on each planet, gather advanced technology, and upgrade your arsenal to survive increasingly dangerous challenges. Void Vanguards is a sci-fi action shooter with rogue-like elements and intense planetary exploration. Each planet offers a unique environment—from blis… If you enjoyed this game, see our list of games similar to Void Vanguards.

    View Game
  8. A.D.A.M. tells the story of a factory worker robot who gains consciousness. Guided only by mysterious messages, hidden by his creator Dr. Eugene Whistlewiley deep in the system logs of the facility's mainframe computer, A.D.A.M. tries to uncover the secret behind his existence. Although A.D.A.M. gained control over his own actions when he was disconnected from the central network, he's got… If you enjoyed this game, see our list of games similar to Adam.

    View Game
  9. P4000: AI-Driven NPC Behavior Research Game (Unreal Engine)   Goal A research-driven Unreal Engine project exploring how players perceive and interact with NPCs that exhibit different competencies and behaviors in a harsh sci‑fi world set on Earth in the year 4000. This project uses that setting as a testbed to study how different AI behaviors influence player experience. This gam… If you enjoyed this game, see our list of games similar to P4000.

    View Game
  10. A gritty first-person space sim where you mine, trade, fight, and salvage across a procedurally generated universe—then breach derelicts in tense FPS missions with permadeath and full ship customization. If you enjoyed this game, see our list of games similar to GCS: Salvage Rat.

    View Game
  11. You crash land on Novark during a rescue mission. With hostile aliens in a war, nowhere is safe and everything is out to kill you. Fight to survive. Discover secrets. Fight epic bosses. Progress through the story. Survive and escape Novark! If you enjoyed this game, see our list of games similar to Novark.

    View Game
  12. In this indie sci-fi FPS action game, designed for virtual reality gameplay, you play as a highly trained astronaut on a mission to investigate a malfunctioning satellite in space. Your task is to enter Starship 43 and restore communication with Earth by sending a critical message. However, things are not as they seem, and you quickly realize that there are dangerous threats lurking within the sta… If you enjoyed this game, see our list of games similar to Starship 43 - The Last Astronaut VR.

    View Game
  13. View Game
    56%Game Brain Score
    Most mentioned positive aspects:music, graphics
    Most mentioned negative aspects:story, gameplay
    92% User Score Based on 12 reviews

    Bulletarium is a fast-paced, retro-style FPS packed with pixelated carnage, relentless demon-slaying, and an old-school, no-frills attitude. Step into a nightmarish hand-drawn world where every corner hides grotesque horrors — from writhing tentacled beasts and blood-soaked eldritch abominations to hulking horned demons and swarms of hellspawn. Armed with devastating weaponry, you’ll blast, shred… If you enjoyed this game, see our list of games similar to BULLETARIUM.

    View Game
  14. 63%Game Brain Score
    Most mentioned positive aspects:story, gameplay
    Most mentioned negative aspects:stability, optimization
    63% User Score Based on 422 reviews

    Ferocious is a survival shooter in which you will discover a lost prehistoric world full of deadly creatures under the control of hostile forces. Fight, Explore, Survive If you enjoyed this game, see our list of games similar to FEROCIOUS.

    View Game
  15. 《Trigger of Silence》 is a first-person survival defense game that combines intense melee combat with gunplay. In this invaded world, you play as a super soldier who must hold your ground and fend off waves of dragon-like humanoid creatures. Powerful Weapons The game features very unique weapons. Each weapon can use skill cartridges to unleash powerful abilities, dealing devastating damage to… If you enjoyed this game, see our list of games similar to Trigger of Silence.

    View Game
  16. View Game
    67%Game Brain Score
    Most mentioned positive aspects:humor, music
    Most mentioned negative aspects:gameplay, story
    84% User Score Based on 31 reviews

    Rat Hunter is a traditional first-person shooter set in a hi-tech environment. It does not push the envelope or bring something fresh to the genre, since we feel that there is little place for innovation in today's action games market. It is, however, solid, polished and smart. Developers lay the emphasis on original ideas in visualization and gameplay design. The action takes place on a remote pl… If you enjoyed this game, see our list of games similar to Rat Hunter.

    View Game
  17. 64%Game Brain Score
    Most mentioned positive aspects:story, gameplay
    Most mentioned negative aspects:optimization, stability
    64% User Score Based on 418 reviews

    The Moon's haunted - and when an astronaut loses contact with Earth, the adventure begins in full. Fill up your oxygen, load up the guns, and set out on an interstellar FPS adventure across the stars, filled with puzzles, fights, exploration, and strange secrets of the universe. If you enjoyed this game, see our list of games similar to Moon Mystery.

    View Game
  18. View Game
    64%Game Brain Score
    Most mentioned positive aspects:atmosphere
    Most mentioned negative aspects:gameplay, story
    70% User Score Based on 43 reviews

    Join Alex on her deadly solo-mission to expose the mysteries of planet Vandermire. Experience a truly transformative third-person shooter and absorb organic abilities to expand your combat and movement capabilities beyond anything you’ve seen before. If you enjoyed this game, see our list of games similar to Otherskin.

    View Game
  19. 95%Game Brain Score
    Most mentioned positive aspects:story, gameplay
    Most mentioned negative aspects:stability, grinding
    95% User Score Based on 7,032 reviews

    Species: Unknown is a first-person survival horror game, playable in co-op with up to 4 players (private or public servers) or solo. You play as a mercenary sent aboard an abandoned spaceship. Your job? Execute high-risk contracts, make it out alive, and claim your reward. But keep in mind that you’re not alone. Something is hunting you… Form a squad of up to 4 players to take on different contrac… If you enjoyed this game, see our list of games similar to Species: Unknown.

    View Game
  20. View Game
    40%Game Brain Score
    Most mentioned positive aspects:optimization, atmosphere
    Most mentioned negative aspects:gameplay, stability
    52% User Score Based on 29 reviews

    Howdy, stranger! Hide from a UFO, find weapon parts, and protect the farm from extraterrestrial threats. Roswell Ranch is a free survival horror game made in Unreal Engine 5. After an ominous 911 call, you are sent to investigate some strange sightings on a farm. It's your job to find the components of BERTHA, the world's first anti-extraterrestrial firearm. Solve puzzles around the farm to find… If you enjoyed this game, see our list of games similar to Roswell Ranch.

    View Game
  21. 98%Game Brain Score
    Most mentioned positive aspects:gameplay, graphics
    Most mentioned negative aspects:optimization, grinding
    98% User Score Based on 131 reviews

    Fight off disgusting beasts and enemies, drill for resources, search for ancient relics, craft technology and upgrades, and use a glove with special abilities in an adventure packed with action! If you enjoyed this game, see our list of games similar to Relic Odyssey: Ruins Of Xantao.

    View Game
  22. 100%Game Brain Score
    Most mentioned positive aspects:gameplay, graphics
    Most mentioned negative aspects:atmosphere
    100% User Score Based on 84 reviews

    Welcome to cosmic chaos. This non-stop action arcade game will test your skill to see if you are truly worthy of space travel. Inside are five classes of weapons, unique maps with multiverse portals and upgrades based on alien technology. Everything to build the ultimate fighting machine — and dominate the arena. Are you ready space pilots? Fight your way to the final showdown inside the myste… If you enjoyed this game, see our list of games similar to Space Battle Royale.

    View Game
  23. 77%Game Brain Score
    Most mentioned positive aspects:story, gameplay
    Most mentioned negative aspects:stability, grinding
    77% User Score Based on 4,924 reviews

    Database for modders of Far Cry 1 Community. Register on ITCH.IO to leave comments and more: Registration  ►Check Far Cry Advanced Version mod! Database including: usefull tools for modding, maps, mods etc... Far Cry 1 DataBase:   SEARCH EVERYTHING IN DATABASE Click on images below to view more info. Game info: Platforms: WindowsDeveloper: Cry… If you enjoyed this game, see our list of games similar to Far Cry®.

    View Game
  24. View Game
    87%Game Brain Score
    Most mentioned positive aspects:graphics, gameplay
    Most mentioned negative aspects:story, grinding
    95% User Score Based on 42 reviews

    Lock and load with Strike Force Delta in this action-packed sci-fi FPS! Play solo or team up to blast through hordes of Gacrux alien invaders, save humanity’s colonies, and dominate intense PvP showdowns. Gear up, soldier, and get ready to lead the Assault on Proxima! If you enjoyed this game, see our list of games similar to Assault On Proxima.

    View Game
  25. View Game
    60%Game Brain Score
    Most mentioned positive aspects:graphics, gameplay
    Most mentioned negative aspects:music, story
    100% User Score Based on 11 reviews

    Planeta 55 is a horror-themed fast action sci-fi FPS Hordes of monsters. New weaponry. Guns. Blood. Fight. If you enjoyed this game, see our list of games similar to Planeta 55.

    View Game
  26. 38%Game Brain Score
    Most mentioned positive aspects:graphics
    Most mentioned negative aspects:gameplay, monetization
    62% User Score Based on 13 reviews

    Robots - Invaders is a first-person 3D adventure game. You wake up early in the morning and realize that the robots no longer obey you, they were attacked by a virus. Alien forces have taken over their minds. Grab your weapons and fight back the invaders! Go through various locations that were occupied by the invaders. Fight robots, aliens, overcome obstacles and solve puzzles to free your la… If you enjoyed this game, see our list of games similar to Robots - Invaders.

    View Game
  27. 74%Game Brain Score
    Most mentioned positive aspects:graphics, music
    Most mentioned negative aspects:grinding, optimization
    81% User Score Based on 251 reviews
    Critic Score 48%Based on 2 reviews

    Discover a vast alien world. Fight the ferocious local fauna and killer machines. Reveal its secrets and find a way to escape. The Mobius Machine is a side-scroller action platformer with dynamic combat and heavy emphasis on exploration. If you enjoyed this game, see our list of games similar to The Mobius Machine.

    View Game
  28. 61%Game Brain Score
    Most mentioned positive aspects:graphics, gameplay
    Most mentioned negative aspects:story, monetization
    61% User Score Based on 109 reviews

    You are entrusted with the role of one of the elite captains, put on a high-tech mech suit suitable for travel into space and go on an exciting journey. If you enjoyed this game, see our list of games similar to Deep Space.

    View Game
  29. 73%Game Brain Score
    Most mentioned positive aspects:story, gameplay
    Most mentioned negative aspects:grinding
    73% User Score Based on 320 reviews

    All people died and you are isolated. Your shelter has become a prison. On the planet of machines, no place for humanity, but it's still perfect place to revenge. You are a defensive combat protocol. Grow! Learn! Survive! Win! If you enjoyed this game, see our list of games similar to Boiling Steel.

    View Game
  30. 19%Game Brain Score
    Most mentioned positive aspects:gameplay, story
    Most mentioned negative aspects:graphics, music
    36% User Score Based on 11 reviews
    Critic Score 12%Based on 1 reviews

    Travel through the galaxy and beat space demons to a bloody pulp in this intense first-person boomer shooter! Use a variety of weapons and powerful drinks created for one purpose only – to bring destruction and lots of blood. If you enjoyed this game, see our list of games similar to Madness Beverage.

    View Game
  31. View Game
  32. View Game
    59%Game Brain Score
    Most mentioned positive aspects:graphics, music
    Most mentioned negative aspects:gameplay, story
    59% User Score Based on 68 reviews

    Planet Station - is a classic 3D action-shooter like Sci-Fi in which you play as an ex sheriff Margaret. The main aim is to survive. By the will of fate, Margaret had to move to another planet and she could hardly imagine what the result would be... If you enjoyed this game, see our list of games similar to Planet Station.

    View Game
  33. View Game
    86%Game Brain Score
    Most mentioned positive aspects:gameplay, graphics
    Most mentioned negative aspects:story, grinding
    86% User Score Based on 423 reviews

    Built exclusively for VR, Cosmic Trip is an award-winning real-time strategy game for the HTC Vive and Oculus Rift. Experience what it’s like to command an army of badass robots and fight against hostile enemies on beautiful alien planets. If you enjoyed this game, see our list of games similar to Cosmic Trip.

    View Game
  34. The only game in the world to bring the joy of tactical FPS games into the single-player experience. Fight the entire world with superpowers gifted to you by sheer luck as you wipe out thousands of the world's most elite defenses while they try predicting, learning, and adapting to your every move.  If you enjoyed this game, see our list of games similar to LOTTERY.

    View Game
  35. View Game
    67%Game Brain Score
    Most mentioned positive aspects:gameplay, atmosphere
    Most mentioned negative aspects:story
    100% User Score Based on 18 reviews

    Invasion 2 aka INV2 Story: The invasion continues. Years after the events of the first game, the mystery remains unsolved. Your father was sent on a critical mission to Mars, but after his departure, all communication was suddenly lost. Now it is up to you to uncover what really happened. Travel to Mars, explore mysterious facilities and abandoned interior locations, and follow the clues left… If you enjoyed this game, see our list of games similar to Invasion 2.

    View Game
  36. The WorldThe world of Orbfall takes place on a post-apocalyptic Earth ruled by an alien invasion force. According to reports from active scouts, the aliens have completely devastated Europe. Entire cities and villages have been erased as if they had never existed. Most survivors live hidden underground, hoping for salvation from the resistance fighters operating on the surface. To avoid detection… If you enjoyed this game, see our list of games similar to Orbfall Reclaim the Planet.

    View Game
  37. After the collapse, the machines took control of the cities. They watch, they listen, and they respond. Fight in a fast-paced FPS where awareness, timing, and skill are the keys to survival. If you enjoyed this game, see our list of games similar to NULL SECTOR: LAST PROTOCOL.

    View Game
  38. View Game
    50%Game Brain Score
    50% User Score Based on 1 reviews

    You awaken on a world that should not exist. The last thing you remember? Crashing onto this barren rock. But instead of the lifeless tomb you expected, you find a sprawling labyrinth of living jungles, shattered machinery, and ancient temples carved into the very heart of the planet.  In Pergamon, unlock new abilities and weapons to forge new paths and piece together the planet's hidden histor… If you enjoyed this game, see our list of games similar to Pergamon.

    View Game
  39. 51%Game Brain Score
    51% User Score Based on 2 reviews

    BTGZ:FC is a sci-fi horror game where you control an advanced well equipped remote-controlled drone sent to explore a dangerous, unknown dimension. Navigate a vast, pitch-black network of tunnels using specialized tools and devices engineered specifically for the drone. Rely on transmitter antennas to maintain connection, gather data, and survive encounters with hostile entities. Stay alert and av… If you enjoyed this game, see our list of games similar to Back To Ground Zero : First Contact.

    View Game
  40. A story-driven FPS game set in an unspecified time, where you work as an agent and face action-packed scenes. As a trained agent, you will be sent on various missions by the company you work for. If you enjoyed this game, see our list of games similar to Universe Conflict.

    View Game
  41. I Hate Robots – a dark sci-fi action shooter.You hate robots, and your only goal is to destroy every metal creature in your path. You must journey through dangerous portals to find the machine lair and wipe them off the face of the earth! Game Features: Diverse levels with unique objectives: survive enemy onslaughts, explore gloomy locations, and hunt for scientific artifacts. An arsenal of 7 w… If you enjoyed this game, see our list of games similar to I Hate Robots.

    View Game
  42. Jump into Mine Spiders, a relentless nightmare buried beneath the desert. The mission was simple: locate the missing team and restore contact. But the deeper you go, the clearer it becomes that this place is far from abandoned. Infested with towering, flesh-eating spiders that move faster than your light can catch, crawling across ceilings, walls, and out of every shadow. With each step forw… If you enjoyed this game, see our list of games similar to Mine Spiders.

    View Game
  43. View Game

    Scionide is a fast-paced sci-fi action shooter set in the war-torn future of the Scion Conflict universe. In the year 2268 AD, humanity is fractured. The Amalgamate Republic, a shattered alliance of frontier colony words fighting for freedom, makes its final stand against the Scion Empire, a militarized regime led by the ruthless Duntana, alien hybrid daughter of the Scion Emperor. As the war rage… If you enjoyed this game, see our list of games similar to Scionide.

    View Game
  44. A 3rd-person shooter in a sci-fi setting where you play as Kwabe, a space researcher partnered with Simon, a highly intelligent scientist cat. Together, you run a space research business, traveling to distant planets to complete contracts. But research isn’t your only challenge—Simon is always hungry and needs to be fed with anything you can find on these planets, including hostile creatures. Exp… If you enjoyed this game, see our list of games similar to Starving Cat.

    View Game
  45. SAVE THE HUMAN RACESeeking vengeance against the creatures that killed his family, embark on a journey to find the source and uncover the mystery of the creatures in this open-world light RPG with horror elements. EXPLORE AN OPEN-WORLDVenture through a post-apocalyptic earth from your homestead and uncover unearthly threats where danger lurks in every corner. Explore enemy encampments and abandon… If you enjoyed this game, see our list of games similar to Fallen Vestige.

    View Game
  46. View Game
    59%Game Brain Score
    Most mentioned negative aspects:gameplay, music
    93% User Score Based on 14 reviews

    Produced by Jerboa Interactive A downloadable game for Windows. Solitude was developed by four students over the course of 1.5 years as part of a school project at Humboldt-Gymnasium Potsdam. After crash-landing on a hostile alien world, you must explore, survive, and gather the parts needed to repair your damaged spaceship. Face dangerous environments, hostile machines, and mysterio… If you enjoyed this game, see our list of games similar to Solitude.

    View Game
  47. A first-person sci-fi horror where Kellan Graves fights through the deadly caverns of Elior. Face relentless creatures and uncover the fate of lost Echo units in a tense, atmospheric, story-driven descent into darkness. If you enjoyed this game, see our list of games similar to Kellan Graves: Fallen.

    View Game
  48. Epoch Spire is a first-person shooter roguelike, where players improve by discovering and understanding the secrets of a spire on an alien planet. If you enjoyed this game, see our list of games similar to Epoch Spire.

    View Game
  49. View Game
    54%Game Brain Score
    54% User Score Based on 5 reviews

    Controller NeededPlayer 1 can use a Mouse and Keyboard but player 2 must use a controller to be able to play. Player 2 can only control menus when they're selecting Hexes or Upgrading About the GameBound in Time is a two player, co-op horde shooter with a sci-fi, futuristic twist – play as two flashy heroes with a number of abilities, a cyborg and a samurai, working together to defend worlds … If you enjoyed this game, see our list of games similar to Bound in Time.

    View Game
  50. 57%Game Brain Score
    Most mentioned positive aspects:emotional, music
    Most mentioned negative aspects:story, gameplay
    92% User Score Based on 13 reviews

    Welcome to the isalnd of thugs. This tropical island is a secret military base of Russian PMC. You are a Special Agent who must find the leader of PMC and eliminate him. Take the gun and let's go! If you enjoyed this game, see our list of games similar to The Island of Thugs.

    View Game